The beginning of the wiring inside the mechanical room.
New wiring installed and wall in the mechanical room freshly painted.
Now to connect the wiring from the panels.
Carter wanted to rewire the panels to make the fore, aft, port and starboard sides are controlled separate from each other. He now has total control of how the flap tracker works.
Completing the finishing touches to the work above deck at the end of the day.
Next was to bring the wiring below deck and run back to the mechanical room. The aft array comes down through the engine room.
The newly installed aft panel up on the sundeck.
This is what I call "controlled chaos." Wiring can be messy.
And the completed project! Toggle switches for each set of panel arrays.
Nice Job Captain Carter!